Join us!


Xingu

Study of energy potential of Xingu River is being evaluated by ANEEL

By: 
Jõao Porto, Amazônia National Radio

Brasília - A study on the possibilities of building hydroelectric dams
on the Xingu River, which flows through Mato Grosso and Pará states,
has been delivered to the National Electrical Energy Agency (ANEEL).

Studies for the document, which the Federal Attorney´s office (MPF)

Estudo sobre potencial energético do Rio Xingu é avaliado pela Aneel

Jõao Porto, Radio Nacional da Amazônia

Brasília - Um estudo sobre as possibilidades de aproveitamento
elétrico no Rio Xingu, que corta os estados do Mato Grosso e do Pará,
foi entregue à Agência Nacional de Energia Elétrica (Aneel).

O documento, que era esperado pelo Ministério Público Federal (MPF) e

Related content:

Indigenous Movement Protests Against the Granting of the Belo Monte Dam Concession in Brasilia

View this page in: Português
By: 
Communications Department / COIAB: Leticia Campos

A mobilization against the signing of the Concession for Belo Monte marked the inauguration of the refurbished Presidential Palace on Thursday, August 26th, 2010.

Related content:

Indígenas protestam contra a concessão de Belo Monte em Brasília

View this page in: English
By: 
Assessoria de Comunicação/COIAB: Letícia Campos

Uma mobilização contra a assinatura do contrato de Concessão de Belo Monte marcou a inauguração do Palácio do Planalto nessa quinta-feira (26).

Related content:

Letter from Brazilian organizations to the Secretary of Development, Science and Technology of the State of Pará

To
Secretary of Development, Science and Technology of the State of Pará

Mr. Secretary,

Related content: