User login

International Rivers Comments on CDM Methodology Proposed for Simimbe Large Hydro (Ecuador)

April 5, 2006

Submitted to CDM Methodology Panel 

Title of new baseline methodology: Country risk analysis, baseline scenario development, and ex-ante baseline emission rate calculation for a grid-connected project that displaces fossil fuel based power generation from the operation and expansion of the electric sector (NM0054)

Barbara Haya
Consultant
International Rivers
April 5, 2006

Contact us: 

Patrick McCully
patrick [at] internationalrivers [dot] org
+1 510 848 1155

Download fileSize
Haya Comments Simimbe Ecuador170.04 KB