Join us! |
Methodology CommentsInternational Rivers Comments on CDM Methodology Proposed for Simimbe Large Hydro (Ecuador)Submitted to CDM Methodology Panel Title of new baseline methodology: Country risk analysis, baseline scenario development, and ex-ante baseline emission rate calculation for a grid-connected project that displaces fossil fuel based power generation from the operation and expansion of the electric sector (NM0054)
Related content:
International Rivers Comments on CDM Methodology Proposed for La Vuelta & La Herradura Large Hydros (Colombia)Submitted to CDM Methodology Panel Title of new baseline methodology: "Baseline methodology for displaced electricity generation in a centrally dispatched hydrothermal interconnected power system" (F-CDM-NM0020) Related content:
International Rivers Comments on CDM Methodology Proposed for Peñas Blancas Large Hydro (Costa Rica)
Submitted to the CDM Methodology Panel on Methodology NM-0008.
Related content:
International Rivers Comments on CDM Methodology Proposed for El Canadá Large Hydro (Guatemala)
Submitted to CDM Methodology Panel for Methodology NM-0006.
Related content:
International Rivers Comments on CDM Methodology Proposed for Nho Que Large Hydro (Vietnam)Submitted to CDM Methodology Panel Title of new baseline methodology: Grid–connected hydroelectric power generation projects in low–density vegetation areas (NM0130) Related content:
Comments on CDM Methodology Proposed for Egiin Gol Large Hydro (Mongolia)Submitted to CDM Methodology Panel Title of new baseline methodology: Grid-connected hydroelectric power generation projects in low-density vegetation areas where average water temperature is low (NM0196).
Barbara Haya Related content:
International Rivers' Comments on Proposed CDM Methodology for Bumbuna Hydro (Sierra Leone)Submitted to CDM Methodology Panel Title of new baseline methodology: Hydropower Projects that Create New Reservoirs or Expand Existing Ones (NM0121)
Related content:
International Rivers Comments on Proposed CDM Methodology for Bayano Large Hydro Expansion (Panama)
International Rivers Comments on CDM Methodology NM0043 Proposed for Bayano Hydroelectric Expansion and Upgrade Project, PanamaSubmitted to CDM Methodology Panel
Related content:
|