User login

Methodology Comments

International Rivers Comments on CDM Methodology Proposed for Simimbe Large Hydro (Ecuador)

Submitted to CDM Methodology Panel 

Title of new baseline methodology: Country risk analysis, baseline scenario development, and ex-ante baseline emission rate calculation for a grid-connected project that displaces fossil fuel based power generation from the operation and expansion of the electric sector (NM0054)

International Rivers Comments on CDM Methodology Proposed for La Vuelta & La Herradura Large Hydros (Colombia)

Submitted to CDM Methodology Panel

Title of new baseline methodology: "Baseline methodology for displaced electricity generation in a centrally dispatched hydrothermal interconnected power system" (F-CDM-NM0020)

International Rivers Comments on CDM Methodology Proposed for Nho Que Large Hydro (Vietnam)

Submitted to CDM Methodology Panel

Title of new baseline methodology: Grid–connected hydroelectric power generation projects in low–density vegetation areas (NM0130)

Comments on CDM Methodology Proposed for Egiin Gol Large Hydro (Mongolia)

Submitted to CDM Methodology Panel 

Title of new baseline methodology: Grid-connected hydroelectric power generation projects in low-density vegetation areas where average water temperature is low (NM0196).

 

Barbara Haya
Consultant
International Rivers
December 19, 2006

International Rivers' Comments on Proposed CDM Methodology for Bumbuna Hydro (Sierra Leone)

Submitted to CDM Methodology Panel

Title of new baseline methodology: Hydropower Projects that Create New Reservoirs or Expand Existing Ones (NM0121)

International Rivers Comments on Proposed CDM Methodology for Bayano Large Hydro Expansion (Panama)

 

International Rivers Comments on CDM Methodology NM0043 Proposed for Bayano Hydroelectric Expansion and Upgrade Project, Panama

Submitted to CDM Methodology Panel